Sequence from the raw ceiling to the completion of the floor structure:
Processing ThermoWhite WD products on the construction site
The installation using the ThermoWhite System MixMobil is shown here. In principle, installation with the ThermoWhite finished products in the 100 and 200 liter bags works in the same way.
- 1. raw installation
Completed installation work before laying ThermoWhite thermal and impact sound insulation.
- 2. processing ThermoWhite
Once the installation work has been completed, the ThermoWhite insulation fill is installed. The material is compacted and leveled to the intended level according to the plan.
- 3. installed ThermoWhite
During installation, the installation lines are seamlessly encased in ThermoWhite and thus insulated.
- 4. installation of foils, panels and underfloor heating
After the drying time, sheets or tiles can be laid on ThermoWhite. If necessary, the underfloor heating can then be installed.
- 5. screed laying
The next step is to lay the screed (flowing screed in this example). The screed is also laid to the desired level according to the plan.
- 6. floor laying
Finally, the desired floor is installed on the screed.