Sequence from the raw ceiling to the completion of the floor structure:

Processing ThermoWhite WD products on the construction site

The installation using the ThermoWhite System MixMobil is shown here. In principle, installation with the ThermoWhite finished products in the 100 and 200 liter bags works in the same way.

  • 1. raw installation
    construction site unfinished installation on the unfinished ceiling

    Completed installation work before laying ThermoWhite thermal and impact sound insulation.

  • 2. processing ThermoWhite
    installation of thermowhirte on the installations on the raw ceiling

    Once the installation work has been completed, the ThermoWhite insulation fill is installed. The material is compacted and leveled to the intended level according to the plan.

  • 3. installed ThermoWhite
    thermowhite ready installed and compacted

    During installation, the installation lines are seamlessly encased in ThermoWhite and thus insulated.

  • 4. installation of foils, panels and underfloor heating
    laying the underfloor heating over the thermowhite thermal and impact sound insulation

    After the drying time, sheets or tiles can be laid on ThermoWhite. If necessary, the underfloor heating can then be installed.

  • 5. screed laying
    flowing screed poured over the heating installation

    The next step is to lay the screed (flowing screed in this example). The screed is also laid to the desired level according to the plan.

  • 6. floor laying
    floor (parquet flooring) laid after installation of thermowhite impact sound and heat insulation

    Finally, the desired floor is installed on the screed.